Southern Railway Daily Thanthi
Tamil Nadu

Thiruvananthapuram-Nagercoil third line moves ahead as SR floats final survey tender

The tender covers the 71 km TVC-NCJ section and includes soil investigation, LiDAR and drone surveys, traffic studies, land acquisition proposals, bridge and tunnel design work, and preparation of EPC-related documents.

DT NEXT Bureau

CHENNAI: The Southern Railway has floated a nearly Rs 98-crore tender for final location survey (FLS), detailed field survey and design-related works for the proposed third railway line between Thiruvananthapuram and Nagercoil (TVC-NCJ).

The tender covers the 71 km TVC-NCJ section and includes soil investigation, LiDAR and drone surveys, traffic studies, land acquisition proposals, bridge and tunnel design work, and preparation of EPC-related documents.

The work on the third line is going on with the doubling work on the existing single-line corridor still underway. The SR has already earmarked around Rs 1,000 crore earlier for the Thiruvananthapuram–Kanniyakumari doubling project.

The TVC-NCJ route is heavily used by daily commuters travelling between Tamil Nadu and Kerala for work, education and business. The current doubling work and the future third-line expansion will improve line capacity, reduce congestion and help operate more passenger and express services on the corridor.

The tender document also includes provisions linked to future corridor expansion in certain stretches, including references to possible multi-line tunnel planning beyond the proposed third line.

Met Amit Shah only to explain DMK’s stand, don’t read it as alliance: Kanimozhi

Tiruparankundram: Deepam lit at Deepathoon amid chants, CRPF cover

Constitutional courts aren't toys; TVK govt brings disgrace to TN, says Edappadi K Palaniswami

Chennai Metro Rail invites firms, educational institutions, hospitals to connect with Phase II stations via FOBs

Chennai: 6 companies enter bid for 1,000 AC e-buses for MTC

SCROLL FOR NEXT