NDRF rescue team at site of tunnel collapse 
National

Silkyara Tunnel collapse: 21 metres drilled through rubble for labourers' rescue

The labourers have been trapped since Sunday morning when a part of the tunnel collapsed following a landslide.

PTI

UTTARKASHI: Working overnight with a powerful machine, rescue workers drilled 21 metres through the rubble in Silkyara tunnel, inching closer to the 40 labourers trapped there for five days.

The workers need to drill up to 60 metres to insert 800 mm and 900 mm diameter pipes – one after the other -- with the help of a giant drill machine till an escape passage is created for the labourers stuck behind the collapsed portion of the under-construction tunnel, NHIDCL Director Anshu Manish Khalkho said.

The labourers have been trapped since Sunday morning when a part of the tunnel collapsed following a landslide.

"Drilling has been done up to 21 metres so far," the state emergency operation centre's control room in Silkyara said.

The stretch where debris is accumulated begins 270 metres from the mouth of the tunnel at Silkyara side.

Uttarkashi District Magistrate Abhishek Ruhela said that the trapped workers are safe and being supplied with oxygen, medicines, and food and water through pipes.

Constant communication is being maintained with them to keep up their morale, he said. 

Met Amit Shah only to explain DMK’s stand, don’t read it as alliance: Kanimozhi

Tiruparankundram: Deepam lit at Deepathoon amid chants, CRPF cover

Constitutional courts aren't toys; TVK govt brings disgrace to TN, says Edappadi K Palaniswami

Chennai Metro Rail invites firms, educational institutions, hospitals to connect with Phase II stations via FOBs

Senior officer harassment case: Cops grill MLA Arul Vignesh for 5 hours

SCROLL FOR NEXT