Representative image 
National

ICF to manufacture 200 kmph speed trains soon

He further said that the ICF is manufacturing 200 Vande Bharat express with sleeper coaches, which would materialise in 30 months.

Online Desk

CHENNAI: The Integral Coach Factory said that it will manufacture 200 kmph speed trains for which tender is in process.

G Mallya, General Manager, ICF who addressed the press conference said: “The speed doesn’t depend on the train itself. We need special type of track, signalling system. When we say trains abroad are running at 350 kmph, it means all the areas which need to be enabled to support the speed are in place.”

“In India, today it is 160 kmph. When we reach 200 kmph, I am sure even the track related works would have been done, thanks to the Vande Bharat.”

He further said that the ICF is manufacturing 200 Vande Bharat express with sleeper coaches, which would materialise in 30 months.

The sleeper coaches will have Kavach- automatic train safety system and fire detection system.

EPS releases “2.0” version of DMK’s popular schemes

PM flags off India’s first Vande Bharat sleeper train from Bengal's Malda

Industry captains welcome Madras HC nod to Vedanta’s green copper plant plan

Alanganallur Jallikattu begins amid grand celebrations in Madurai

NDA set to rewrite TN's political future in 2026, claims BJP