Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB) 
Chennai

Sewage pumping to be suspended in Ambattur zone for 2 days

Sewage pumping stations in the area will remain non-operational from 11 am on August 29 to 4 pm on August 30.

DT NEXT Bureau

CHENNAI: The Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB) will carry out pipeline connection work with the main sewage line under the Padi flyover in the Ambattur zone.

As a result, sewage pumping stations in the area will remain non-operational from 11 am on August 29 to 4 pm on August 30.

Korattur, Lenin Nagar, Sangam, Ayyappakkam, VOC Nagar, Nehru Nagar, Thendral Nagar, Kallikuppam Karuppankulam, Karukku, Pallam, CITCO Nagar, Kachanakuppam, East Avenue, and Ilango Nagar will be affected. For assistance, residents can call the area engineer at 8144930907 or the deputy area engineer at 8144930257.

Tale of two roadshows: CM Vijay hits trail at Madurantakam, MK Stalin in Amaravathi

Pocso case: Granite baron Veeramani, couple detained under Goondas Act

Tamil Nadu: 9 workers faint after boiler blast in Tirupur

Northeast monsoon may begin between October 15-21: IMD

Two die, five injured after car collides with lorry in Tiruchy

SCROLL FOR NEXT