Representative image 
Chennai

Limited Use Subway construction between Pattabiram – Nemilichery taken up at Rs 4.5 cr

Construction of the Limited Use Subway measuring 4.5m x 4.5m is expected to be completed within five months.

DTNEXT Bureau

CHENNAI: Chennai railway division has commenced the construction of a Limited Use Subway (LUS) between Pattabiram and Nemilichery railway stations in Chennai Central – Arakkonam section to eliminate level crossings and ensure seamless train operations and accident-free safe movement of road and rail users.

In the first phase, the work of construction of LUS in lieu of Level Crossing No.11 commenced on November 4 at an estimated cost of Rs 4.5 crores.

Construction of the Limited Use Subway measuring 4.5m x 4.5m is expected to be completed within five months.

The subway would be useful for passage of all types of vehicles, said a release issued by Chennai division, which announced a 12-hour mega line/power block on November 5 to facilitate the construction work.

The replacement of Level crossing with LUS is a significant leap in improving the safety and efficient functioning of Railways aimed at betterment of services towards its passengers, the release added.

Exit polls predict DMK to retain Tamil Nadu, UDF return in Kerala, BJP edge in West Bengal

Seven killed in Bengaluru govt hospital wall collapse, CM orders probe

Tamil Nadu Assembly election 2026 |DMK wins majority among exit polls; one predicts big win for Vijay's TVK

2026 TN elections | Observers for all segments to arrive on May 2

Married one day, widowed the next: Inside Koovagam festival