Representative image 
Chennai

GCC clears waterways before Northeast monsoon

The storm water drain department of Chennai Corporation maintains 30 macro drains for a total length of 48.80 kilometers.

DTNEXT Bureau

CHENNAI: The Greater Chennai Corporation has intensified works to remove hyacinth and silt from the macro drains across the city to ensure free flow of water during the northeast monsoon.

According to a Chennai Corporation statement, hyacinth and silt weighing a total of 430.61 tonnes have been removed from Kodungaiyur Canal (North), Virugambakkam Canal, North Avenue Canal, Padikuppam Canal, MGR Canal, Mambalam Canal, Puliyur Canal, Ekankipuram Canal, Otteri Canal, Ennore Pond, Taramani Lake, Kodungaiyur Link Canal, Cooum River, Adyar River and Buckingham Canal using amphibian machines in the last 15 days between June 1 and June 15.

During the next 15 days, works will be carried out in Kodungaiyur Canal (South), TVS Canal, Guindy IE Canal, Veerangal Odai and others. Apart from amphibian machines, robotic excavators will also be used.

The storm water drain department of Chennai Corporation maintains 30 macro drains for a total length of 48.80 kilometers.

Visit news.dtnext.in to explore our interactive epaper!

Download the DT Next app for more exciting features!

Click here for iOS

Click here for Android

Attacks ramp up in Iran war including strikes on Iranian nuclear facilities, US troops in Saudi

DT Next reporter wins Ramnath Goenka Excellence in Journalism Award

DT Next Constituency Watch | Tambaram: Growth outpaces civic basics as residents seek accountability

Chennai: A shelter for trans women to live with dignity, independence

Chennai: Royapuram station continues to languish in neglect