CMRL restores Purasawalkam High Road to prevent water-logging  
Chennai

CMRL restores Purasawalkam High Road to prevent water-logging during monsoon

CMRL officials assured that the entire stretch would be restored to prevent no water-logging during the northeast monsoon.

DTNEXT Bureau

CHENNAI: After DT Next reported on the poor condition of roads at Purasawalkam High Road due to corridor 3 metro rail construction, the Chennai Metro Rail Limited (CMRL) has restored the road recently.

CMRL officials assured that the entire stretch would be restored to prevent no water-logging during the northeast monsoon.

Residents and commuters of Purasawalkam High Road and Millers Road pointed out the shoddy road condition in the area recently and little to no intervention from officials. A CMRL official said, “As part of the monsoon preparedness plan to avoid rain water stagnation by giving one-side slope, we have currently restored the road. Walkways will also be restored.”

LIVE | Tamil Nadu Assembly election results 2026: Vijay's TVK wins 75 seats; DMK alliance gets 66; AIADMK front: 39

TN election results 2026: Flags raised, banners go up, TVK cadres mark fort at Panaiyur

TVK candidate ECR Saravanan defeats DMK by massive margin in Sholinganallur

Stalin second sitting CM, after Jayalalithaa, to face defeat

TN election results 2026: TVK - the rare 'political startup' that turned 'unicorn' instantly