11 foot overbridges commissioned across Chennai Division in 2025–26  
Chennai

11 foot overbridges commissioned across Chennai Division in 2025–26

The new FOBs have been provided to enable movement between platforms without crossing tracks. One of the bridges has been built under the Amrit Station Scheme.

DT NEXT Bureau

CHENNAI: Chennai Division of Southern Railway commissioned 11 foot overbridges (FOBs) across its network during the 2025–26 financial year, covering both major and smaller stations.

The new FOBs have been provided to enable movement between platforms without crossing tracks. One of the bridges has been built under the Amrit Station Scheme.

A 12 metre wide FOB was commissioned at Tiruttani in March 2026. The facility is intended to handle high passenger movement at the station, which sees heavy footfall, especially during peak periods.

Other FOBs have been installed at stations including Walajabad, Tirumalpur and Anavardikhanpettai, as well as at Chitteri, Mukundarayapuram, Pudi, Tiruvalam, Vepagunta, Ponpadi and Palur.

Mekedatu project: Shivakumar seeks TN's cooperation, says it will benefit state more than K'taka

Chennai sees sharp rise in air pollution after Deepavali celebrations

Karamoko-Waltert combination too strong for Indians in Chennai Open final

Mumbai: 700 gm premature baby gets new life after five-month battle

Toll in OIL's Assam facility fire rises to 4 as another injured dies; 4 suspended

SCROLL FOR NEXT