GSLV-F17 vehicle before being moved to the second launch pad in Sriharikota. 
Tamil Nadu

ISRO in final preparations phase for GSLV-F17 mission

The GSLV-F17 was moved to the Second Launch Pad (SLP) around 8 pm. The mission is scheduled for launch on September 4 and will place the 2,367-kg EOS-05, also known as GISAT-1A, into a Sub-Geosynchronous Transfer Orbit (SubGTO)

DT NEXT Bureau

CHENNAI: ISRO has begun the final phase of preparations for the GSLV-F17 mission, with the launch vehicle being moved to the launch pad at the Satish Dhawan Space Centre (SDSC-SHAR) in Sriharikota on Friday night for the launch of the EOS-05 Earth observation satellite.

The GSLV-F17 was moved to the Second Launch Pad (SLP) around 8 pm. The mission is scheduled for launch on September 4 and will place the 2,367-kg EOS-05, also known as GISAT-1A, into a Sub-Geosynchronous Transfer Orbit (SubGTO). The orbit will have a perigee (closest point to Earth from satellite) of 170 km and an apogee (highest point from the satellite) of 28,934 km.

EOS-05 is a civilian and strategic Earth observation satellite designed to provide frequent, near-real-time imagery of large areas of the country. It is being launched as a replacement for EOS-03, also known as GISAT-1, which was lost during the failed GSLV-F10 mission on August 12, 2021.

The GSLV-F10 mission failed because of a technical anomaly in its cryogenic upper stage. While the first and second stages performed normally after lift-off, the cryogenic engine in the third stage failed to ignite, resulting in the loss of the EOS-03 satellite.

Nearly five years after the setback, ISRO is now set to restore the Earth observation capability with the EOS-05 mission. The satellite is designed to capture images in multispectral and hyperspectral bands under cloud-free conditions at frequent intervals.

It is expected to provide images of selected regions every five minutes and cover the entire Indian landmass every 30 minutes, with a spatial resolution of around 42 metres.

The satellite is expected to support a range of applications, including weather tracking, disaster monitoring, particularly floods, cyclones and forest fires, agriculture, forestry, and strategic and national security surveillance.

Women make up just 10% of political reps: Annamalai

Tamil Nadu: Oct 31 deadline for govt staff to file asset details

TN government to run 2,725 special buses to clear weekend rush

Farmer dies after car in Erode Collector’s convoy hits two-wheeler

Special team to probe eMudhra incident; impact on Indian websites, applications very limited: Govt

SCROLL FOR NEXT