CMRL officials inspect trainset manufacturing for phase II 
Chennai

CMRL officials inspect trainset manufacturing for phase II

The firm is set to supply 26 trainsets of three car configurations at the cost of Rs 946 crore. It is to be noted that the firm built metro trains for phase I as well.

DTNEXT Bureau

CHENNAI: The Chennai Metro Rail Limited (CMRL) on Tuesday held inspection of 26 trainset manufacturing for corridor 4 of Metro phase II construction at Sri City. For the proposed train sets, CMRL in November 2022 awarded the contract to M/s. Alstom Transport India Limited, located in Tada.

The firm is set to supply 26 trainsets of three car configurations at the cost of Rs 946 crore. It is to be noted that the firm built metro trains for phase I as well.

The newly-ordered Metro train sets for phase 2 is to have upgraded features along with driverless operation at grade of automation 4. CMRL managing director MA Siddique, director (system and operations) Rajesh Chaturvedi, CGM (rolling stock) AR Rajendran and others inspected the facility on Tuesday. While the MD urged for early delivery of train sets for phase II.

Visit news.dtnext.in to explore our interactive epaper!

Download the DT Next app for more exciting features!

Click here for iOS

Click here for Android

2026 TN elections | Vijay elected TVK Legislature Party leader, seeks mandate to form government, Vijay to remain as Perambur MLA, decides resign from Tiruchy East

Tamil Nadu Governor accepts Stalin's resignation as CM

Will continue to take important political decisions jointly with Left parties, says VCK chief

TN election results 2026: TVK must spell out its stand on government formation, says CPM

TN election results 2026: Congress cadres favour alliance with TVK, says Girish Chodankar