CMRL officials inspect trainset manufacturing for phase II 
Chennai

CMRL officials inspect trainset manufacturing for phase II

The firm is set to supply 26 trainsets of three car configurations at the cost of Rs 946 crore. It is to be noted that the firm built metro trains for phase I as well.

DT NEXT Bureau

CHENNAI: The Chennai Metro Rail Limited (CMRL) on Tuesday held inspection of 26 trainset manufacturing for corridor 4 of Metro phase II construction at Sri City. For the proposed train sets, CMRL in November 2022 awarded the contract to M/s. Alstom Transport India Limited, located in Tada.

The firm is set to supply 26 trainsets of three car configurations at the cost of Rs 946 crore. It is to be noted that the firm built metro trains for phase I as well.

The newly-ordered Metro train sets for phase 2 is to have upgraded features along with driverless operation at grade of automation 4. CMRL managing director MA Siddique, director (system and operations) Rajesh Chaturvedi, CGM (rolling stock) AR Rajendran and others inspected the facility on Tuesday. While the MD urged for early delivery of train sets for phase II.

Visit news.dtnext.in to explore our interactive epaper!

Download the DT Next app for more exciting features!

Click here for iOS

Click here for Android

New police commissioners for Tambaram and Avadi

CM Vijay to chair Collectors, SPs review meet on June 29

Release White Paper on Muslims' welfare, urges MMK president Jawahirullah

Tamil Nadu: Poll promises, crop loan waiver trigger sharp exchanges

YouTuber Savukku Shankar moves MHC for CBI investigation against DVAC chief ADGP Arun