National

CAG faults charge disbursal by CMRL to Tangedco

The Comptroller and Auditor General of India (CAG) has found fault with the Chennai Metrol Rail Limited ( CMRL) for incurring avoidable payment of Rs. 9.08 crore by way of compensation charges levied by the Tamil Nadu Generation and Distribution Corporation Limited due to Low Power Factor (LPF).

migrator

New Delhi

In a report tabled in Parliament earlier this week, the government’s top auditor said, “Delay in taking corrective action resulted in non-compliance of statutory requirement as well as avoidable expenditure of Rs 9.08 crore to Tangedco.”


It said the Tamil Nadu Electricity Regulatory Commission (TNERC) in 2012 stipulated that in respect of High Tension (HT) service connections, the Average Power Factor of the consumer installation should not be less than 0.90. If APF is less than the stipulated level, compensation charges ranging from one per cent to two per cent of the current consumption charges would be levied. Further, it was obligatory on the part of the consumer to improve the power factor of their connected loads to the required level in accordance with the provisions of the code, the report said.

Visit news.dtnext.in to explore our interactive epaper!

Download the DT Next app for more exciting features!

Click here for iOS

Click here for Android

DMK MP accuses govt of abject surrender in striking one sided trade deal with US

Dreading Vijay's mass appeal, DMK curtailing public meets: TVK

Sathiyan, mixed doubles pair of Shah and Chitale to lead Indian challenge in WTT Chennai

Two tunnel boring machines mark breakthroughs on Corridor-4 of Chennai Metro Phase-2

Punjab: Law student kills woman classmate inside classroom, then shoots himself