Chennai

Straight training wall at Ennore creek will reduce flood risk: IIT-M

Studying the past floods in and around Chennai, researchers from the Indian Institute of Technology- Madras have proposed the construction of straight training walls at the mouth of Ennore Creek to significantly minimise flood risk upstream.

migrator

Chennai

The study focused on extreme storm surge scenarios and high tide levels along with flooding in the river and found heavy siltation and narrowness of the mouth of the creek posed flood threat to the adjoining areas.

The flood risk at north Chennai could be significantly minimised by straight training walls at the creek mouth and regular desilting of the river, the study said. An earlier proposal to erect curved training wall would only worsen the situation by blocking the free exchange of seawater with the creek, thereby increasing the flood risk, it added.

Prof V Sundar, Department of Ocean Engineering, IIT-Madras, said, “A straight structure with sufficient crest height is essential to ensure the tidal prism ingress for flushing. Further, in the event the shoreline south of the southern training wall reaches its tip, either dredging or its further extension into a water depth of 6 to 7m is feasible with ease. Further, the straight training walls would act in complement with the present series of groynes which were designed by IIT Madras for shore protection, too.”

Visit news.dtnext.in to explore our interactive epaper!

Download the DT Next app for more exciting features!

Click here for iOS

Click here for Android

AIADMK issues defamation notice to minister Nirmal Kumar demanding Rs 1 cr in damages

Tamil Nadu mulls selling rice at Rs 40-Rs 50 per kg in cooperative stores

Tamil Nadu eases mobile phone restrictions at 52 temples, bans photography and selfies

Air India Frankfurt-Delhi flight diverted to Jaipur following hijack alert

Is waving national flag a crime: Kejriwal on CJP leaders' judicial custody

SCROLL FOR NEXT