

Bengaluru
The Minister, in a tweet on Friday night, shared a video showing a water filled glass kept on a table in a compartment and not a drop spilling out during the recent trip.
"The journey was so smooth that not even a single drop of water drop spilled out of the glass while the train was travelling at high speed.
The results of intensive track Railway track maintenance carried out between Bengaluru & Mysuru in Karnataka are there for everyone to see," he tweeted.
A Railway officer said the work on the over 130 km stretch was undertaken over the past six months at a cost of Rs 40 crore.
Ballast insertion, tamping of tracks and strengthening of embankments were some of the works carried out, she said.
Visit news.dtnext.in to explore our interactive epaper!
Download the DT Next app for more exciting features!
Click here for iOS
Click here for Android