Representative Image  
Chennai

These areas of Chennai will face power shutdown on May 15; check details

Supply will be resumed before 2 pm if the works are completed.

DTNEXT Bureau

CHENNAI: The power supply will be suspended in the following areas from 9 am to 2 pm on Thursday to perform various maintenance works. Supply will be resumed before 2 pm if the works are completed.

Egmore: Part of Sydenhams Road, Deppo Street, PT Mudhali Street, part of Sami Pillai Street, AP Road, Hunters Lane, General Collins Road, Madex Street, VV Koil Street, Kuravan Kulam, Subbaha Naidu Street, Nehru Stadium (both outdoor and indoor), Apparao Garden, Periya Thambi Street, Andiyappan Street, Anandha Krishnan Street, PK Mudhali Street, Choolai Area, KP Park Area, Perambur Barrax Road, Rotler Street, Kalathiyappa Street, Virchurmuthaiyah Street, Daly Street, Manickam Street, part of Rengaiah Street, part of Astabujam Road, and part of Raghava Street.

Parivakkam: Thirukoilpaththu, Thirumanam, Kavalcherri, Vayalanallur, Sorancherri, Oilcheri, Chitukadu.

Tiruverkadu: Therodum Veethi, Sannadhi Street, Ramdoss Nagar, Chinna Koladi, Thiruvengadam Nagar, Anbu Nagar, Chelliamman Nagar, Devi Nagar, Kaveri Nagar, Srinivasa Nagar, Arul Nagar, Nadasenar Nagar, Bharathinagar, Lakshmi Nagar phases I and II.

Chennai: Gold touches 2025 high, sovereign costs Rs 1.04 lakh, silver hits records Rs 274 per gram on December 27

AIADMK didn’t do 5% of DMK govt’s works: CM Stalin

Poll plot thickens: BJP slams ‘fake’ secularism, DMK flays ‘hate’ politics

Bodinayakanur: 87 voters listed under single address

Tamil Nadu professors can apply for general transfer counselling before January